Date of Award

Fall 1992

Document Type

Thesis - Restricted

Degree Name

Master of Science (MS)

Department

Electrical Engineering

Abstract

Theoretically the Manual of Uniform Traffic Control Devices (MUTCD) addresses warranting of traffic control signals at intersections that exhibit characteristics of high peaking, such as a factory exit or sports stadium with warrant #9, Four Hour Volumes, warrant #10, Peak Hour Delay and warrant #11, Peak Hour Volume. However, as most practicing traffic engineers are aware, the majority, if not all, of these intersections are warranted by warrants #1 - #9 and/or #11. This is due to the extremely high threshold values that must be obtained in order to meet warrant #10. The research introduced in this thesis presents an argument to modify the existing threshold values for warrant #10, Peak Hour Delay, in order to make it more realistic and useful.

Share

COinS

Restricted Access Item

Having trouble?